WebPOST-INSTALLED ANCHORS: Material Verification and Testing: Table 1705A.3, ACI 318-14 Sections 26.12 & 26.13 SOILS TMS 402-13/ACI 530-13/ASCE 5-13 Table 3.1.3 & TMS 602-13/ACI 530.1-13/ASCE 6-13 Table 5 Inspection: Table 1705A.2.1, AISC 303-10, AISC 360-10, AISC 341-10, AISC 358-10, AISI S100-07/S2-10 17. WebCast-In-Place Anchors. Cast-in-place anchors are anchor bolts that are cast in wet concrete before the concrete sets. Normally the anchor bolt will be installed in the foundation, which is then filled with wet concrete, only leaving the projecting thread of the anchor bolt exposed. The most common configurations of a cast-in-place anchor are a ...

IR 23-1: Prefabricated Wood Construction …

WebIn addition to the above reference and code materials, go to DSA web site, click on "Publications" and download (free) "DSA Interpretation of Regulations". These free IRs cover specifics on everything from inspector duties to installation of lay in ceiling systems to installation of post installed anchors! WebSep 24, 2024 · DSA IR 17-9 . HIGH-STRENGTH STRUCTURAL BOLTING INSPECTION: 201 9 CBC . IR 17-9 (rev 09/24/19) Page 2 of 5 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA . 2.2 . Review manufacturer’s Material Test Report (MTR) for conformance with documents listed in … samsung akg type-c earphones https://technologyformedia.com

IR 17-8.16: Sampling and Testing of High-Strength

WebDSA File Number: Increment Number: Date Submitted: 2/14/2024 DGS DSA 103 (Issued 12/2024) DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA Sections 17.8 & 26.13. * May be performed by the project inspector when specifically approved by DSA. ☑ b. Test post-installed anchors. … WebJul 2, 2012 · You must file IRS Form 8606 with your tax return. This form will track your after-tax IRA contributions. Each year you bring the prior year-end balance forward and … WebThe installation of post-installed mechanical anchors, adhesive anchors, and screw anchors shall comply with Table 1705.37. The special inspection shall include the verification of compliance with approved construction documents and standards established by the commissioner pursuant to Section 28-113.2.2 of the Administrative Code. 1. samsung akg tuned headphones

DSA-206: Post Installed Anchor Test Report - California

Category:CQA - FAQ

Tags:Dsa ir post installed anchors

Dsa ir post installed anchors

Section 09 51 00 - Acoustical Ceilings - Design & Construction

WebGenerally, the structural tests and special inspections noted on this form are those that will be performed by the Geotechnical Engineer of Record, Laboratory of Record, or Special … WebInspect installation of post-installed anchors See Notes SI* 1616A.1.19, Table 1705A.3 Item 4a (Continuous) & 4b (Periodic) (See Appendix for exemptions). ACI 318-14 …

Dsa ir post installed anchors

Did you know?

WebGenerally, the structural tests and special inspections noted on this form are those that will be performed by the Geotechnical Engineer of Record, Laboratory of Record, or Special Inspector. The actual complete test and inspection program must be performed … WebWhen post-installed anchors are used for other structural applications, all such anchors shall be tested. When post-installed anchors are used for nonstructural components, …

WebAug 28, 2012 · Install ceiling grid in accordance with requirements of manufacturer’s ICC Evaluation Survey Report (ESR) and applicable code requirements including DSA IR 25-5 for alternate Seismic Design Category [C]--or--[D]--or--[E]--or--[F]. Ceiling grid may be attached to not more than two adjacent walls, and at least 3/4 inch clear of other walls. Web955 Franklin St Beaumont, TX 77701 409-838-6551 Fax 409-838-2952 [email protected]

WebDSA IR 25-3.13 . GYPSUM BOARD CEILING SUSPENSION CONVENTIONAL CONSTRUCTION – ONE LAYER . DSA IR 25-3.13 (rev 04-08-14) Page 2 of 5 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA. 3.2.1 Main Runner Spacing and Span: The main runner most frequently … WebSep 24, 2024 · for threaded steel anchor bolts and anchor rods are outside the scope of this IR. See . IR 17-11: Identification, Sampling and Testing of Threaded Steel Anchor Bolts and Anchor Rods . for additional information. DSA requirements for the following items are addressed herein. • Material identification and required identification documentation.

WebThe anchorages of unbonded tendons shall develop at least 95 percent of the minimum specified ultimate strength of the pre-stressing steel. The total elongation of the tendon …

WebPost-installed anchors for the following: 1) exempt non-structural components (e.g., mechanical, electrical, plumbing equipment) given in ASCE 7-10, Section 13.1.4 (and … samsung alarm sound 1 hourWebMay 13, 2024 · connectors. Post-installed anchor design and testing shall also comply with California Building Code (CBC), Sections 1617A.1.19 and 1910A.5. Requirements for … samsung akg type c earphones reviewWebWhen post-installed anchors are used in lieu of cast-in place bolts, the installation verification test loads, frequency and acceptance criteria shall be in accordance with this section. 1910A.5.1 General Test loads or torques and acceptance criteria shall be shown on the construction documents. samsung akg type c headsetsamsung alerting notificationsWebPost-Installed Concrete Anchor Installation Inspector. Definition: A certified Post-Installed Concrete Anchor Installation Inspector* is an individual who has demonstrated the … samsung alarm clock widgetWebAnchors. Installed in Concrete. Method: Anchors were proof loaded to the specified load using the following apparatus: Dynamometer Torque Wrench Hydraulic Jack System … samsung akg wired headphonesWebJan 2, 2024 · Inspect installation of post-installed anchors See Notes SI* 1617A.1.19, Table 1705A.3 Item 4a (Continuous) & 4b (Periodic), 1705A.3.8 (See Appendix for … samsung akg y500 wireless headphones blue